To provide for enhanced safety and reliability, alpex connectors must be pressure-tested after installation and before any plaster or screed is applied. Testing can be carried out using water or compressed air and is generally a two-step process for all drinking water and heating installations: Firstly, the installation is tested for leak-tightness, and secondly, for strength.